Stormwater Services
 GO
Official website for City of Concord, NC | Site Map | Home
Post-Construction Stormwater Management

The purpose of the post-construction stormwater management program is to manage stormwater runoff from new development/redevelopment that drains to the MS4 and disturbs an acre or more of land surface, including projects less than an acre that are part of a larger common plan of development or sale. The program also is required to provide mechanism to require long-term operation and maintenance of BMPs and ensure controls are in place to minimize water quality impacts.

The City adopted and approved a post-construction stormwater management ordinance, included in the Development Ordinance, on January 12, 2006. The City enforces and implements the requirements of the ordinance for post-construction stormwater management and only allows the use of stormwater quality BMPs designed in accordance with the NCDWQ Stormwater Best Management Practices Manual. Additionally, the City requires annual inspections and operation and maintenance (O&M) reports from BMP owners and is implementing long term O&M by legal documentation and the posting of security bonds.

 

 

To control Fecal Coliform sources, the City provides plastic bags for pet waste in City parks and along the greenways.

 

 

 

Mailing Address
City of Concord

Stormwater Services

P.O. Box 308

Concord, NC 28026

 

Physical Address
Alfred M. Brown Operations Center
850 Warren C Coleman Blvd.

Concord, NC 28025

 

For Stormwater related issues, please contact our Call Center.

 

Call Center
704-920-5555